515 3 114342: Difference between revisions

From CellMapper Wiki
Jump to navigation Jump to search
update
added content
Line 1: Line 1:
Smart LTE and 5G NR installed on a lattice tower. (April 27, 2024)
Smart LTE and 5G NR installed on a lattice tower (March 7, 2025).


A cluster of 3 sectors in that area, broadcasting LTE850, LTE1800, TDD-LTE2300 and 5G NR SA/NSA per sector.
A cluster of 3 sectors in that area, broadcasting LTE850, LTE1800, TDD-LTE2300 and 5G NR SA/NSA per sector.
Line 5: Line 5:
Each sector has separate eNB IDs: [[515 3 217313|eNB ID 217313]]
Each sector has separate eNB IDs: [[515 3 217313|eNB ID 217313]]


==Gallery==
===5G NR mast==
Site before 5G NR mast had been added (photographed in January 1, 2018)
Site before 5G NR mast had been added (photographed in January 1, 2018)


Line 13: Line 15:
[[file:Smart_eNB_ID_114342-1.jpg|350px]]
[[file:Smart_eNB_ID_114342-1.jpg|350px]]


Site photographed in April 27, 2024:
===Full view==
Site taken on April 27, 2024:


[[File:Three cellsites 20240427 084127.jpg|350px]]
[[File:Three cellsites 20240427 084127.jpg|350px]]
Site taken on September 17, 2024:
[[File:Three_cellsites_20240917_165247.jpg|350px]]

Revision as of 00:43, 7 March 2025

Smart LTE and 5G NR installed on a lattice tower (March 7, 2025).

A cluster of 3 sectors in that area, broadcasting LTE850, LTE1800, TDD-LTE2300 and 5G NR SA/NSA per sector.

Each sector has separate eNB IDs: eNB ID 217313

=5G NR mast

Site before 5G NR mast had been added (photographed in January 1, 2018)

Site after 5G NR mast had been added (photographed in May 9, 2022)

=Full view

Site taken on April 27, 2024:

Site taken on September 17, 2024: