Difference between revisions of "515 3 130710"

Jump to navigation Jump to search
12 bytes removed ,  09:28, 24 July 2023
correction
(grammar tweaks)
(correction)
 
Line 1: Line 1:
Smart LTE and 5G NR installed on a lattice tower. (June 30, 2022)
Smart LTE and 5G NR installed on a lattice tower. (July 24, 2023)


A cluster of 3 sectors in that area, broadcasting LTE700, LTE1800, LTE2100 and 5G NR SA/NSA per sector.
A cluster of 3 sectors in that area, broadcasting LTE700, LTE1800, LTE2100 and 5G NR SA/NSA per sector.


Site before the 5G network capacity upgrade, with guyed tube tower at the background. (October 11, 2021)
Site before 5G NR mast had been added, with guyed tube tower at the background. (October 11, 2021)


[[file:Smart_eNB_ID_130710.jpg|300px]]
[[file:Smart_eNB_ID_130710.jpg|300px]]


Site after the 5G network capacity upgrade. (May 31. 2022)
Site after 5G NR mast had been added. (May 31. 2022)


[[file:Smart_eNB_ID_130710-1.jpg|300px]]
[[file:Smart_eNB_ID_130710-1.jpg|300px]]
2,309

edits

Navigation menu