Difference between revisions of "310 260 116919"

Jump to navigation Jump to search
95 bytes added ,  18:51, 8 March 2022
no edit summary
Line 1: Line 1:
''"By far, the most likely candidate is the tower located immediately south of the State Farm campus."
''"By far, the most likely candidate is the tower located immediately south of the State Farm campus."
''
''
Our problem with that is that said site is showing no indications it is broadcasting a T-Mobile signal. As of 3/7/2022, the Sprint site, which does have a permit for conversion to T-Mobile, is still broadcasting at least both B25 and B26; indicating the site has yet to be converted as the site post conversion should only be broadcasting b25 per the conversion permit.
Our problem with that is that site is showing no indications it is broadcasting a T-Mobile signal. As of 3/7/2022, the Sprint site located there, which does have a permit for conversion to T-Mobile, is still broadcasting at least both B25 and B26; indicating the site has yet to be converted as the site post conversion should only be broadcasting b25 per the permit. We've reverted the location multiple times, because we are fairly confident it is not that site.
8

edits

Navigation menu