234 31 31203

From CellMapper Wiki
Revision as of 12:57, 12 November 2024 by Aidanmacgregor (talk | contribs)
Jump to navigation Jump to search

Planning Permission Authority:
https://developments.southglos.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=P212REOKN0600

Description:
ADComms was contracted by Network Rail Telecom to work with them and Mobile Network Operator, EE, to modify the existing Severn Tunnel radio infrastructure by designing and installing a Neutral Host Distributed Antenna System. The objective was to provide radio coverage with the lowest Radio Frequency (RF) loss that can reasonably be achieved, within the technical and financial constraints, across the multiple frequency bands currently used by the four UK Mobile Network Operators.

Notes:
ESN coverage by EE for the Severn Tunnel.
https://adcomms.ltd/project/severn-tunnel/

Template & Resources
https://github.com/aidanmacgregor

Image [2023]:

20180309 100112-scaled.jpg