Difference between revisions of "262 3 42407"
Jump to navigation
Jump to search
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used. | 2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used. | ||
2022-04-27: new STOB (064636) with TEF n78 | |||
2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live | 2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live | ||
[[File:262_1_tbd_262_3_42407_A.jpg|400px]] | 2022-08-05: TEF Nokia N78 AAUs mounted + swapped to SRAN, NR (N78+N3) and 4x4 MIMO on B1/3 active | ||
[[File:262_1_tbd_262_3_42407_A.jpg|400px]]<br> | |||
+N78/N3 DSS // 4x4 MIMO B1/3 // First seen: 2018 | |||
[[File:262_1_tbd_262_3_42407_G.jpg|400px]] |
Latest revision as of 15:54, 31 August 2022
2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used.
2022-04-27: new STOB (064636) with TEF n78
2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live
2022-08-05: TEF Nokia N78 AAUs mounted + swapped to SRAN, NR (N78+N3) and 4x4 MIMO on B1/3 active