Difference between revisions of "310 410 726618"
Jump to navigation
Jump to search
(Created page with "Tower built by Parallel Infrastructure in 2022 for AT&T to replace nearby eNB 722618. which used an SBA tower.<br/> FCC ASR 1322227<br/>") |
|||
Line 1: | Line 1: | ||
Tower built by Parallel Infrastructure in 2022 for AT&T to replace nearby eNB 722618. which used an SBA tower.<br/> | Tower built by Parallel Infrastructure in 2022 for AT&T to replace nearby eNB 722618. which used an SBA tower.<br/><br/> | ||
4950 W 200 N Huntington IN<br/> | |||
FCC ASR 1322227<br/> | FCC ASR 1322227<br/> |
Latest revision as of 13:41, 7 February 2023
Tower built by Parallel Infrastructure in 2022 for AT&T to replace nearby eNB 722618. which used an SBA tower.
4950 W 200 N Huntington IN
FCC ASR 1322227