Difference between revisions of "310 260 22081"
(add photo) |
(add notes) |
||
Line 47: | Line 47: | ||
* constructed 07/30/2005 | * constructed 07/30/2005 | ||
== Upgrade notes == | |||
March 8, 2023: Bell tower is open for upgrade. | |||
March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.) | |||
[[Category:T-Mobile in El Paso County Colorado]] | [[Category:T-Mobile in El Paso County Colorado]] |
Revision as of 00:34, 26 March 2023
This is a cell site at Springs Community Church at Lexington Dr and Woodmen Road.
This photo was taken 3/18/2023 during upgrades for Dish and T-Mobile. (Identification thanks to reddit discussion).
These are photos that were taken March 3, 2023. The signs in one photo mention Rangewood and Dublin, but those are not the closest crossroads. There is cell equipment in the bell tower too.
Carrier identification thanks to u/thisisausername190 on reddit
Google Street View photos has photos from September 2007 to September 2022.
Physically at this site
- T-Mobile LTE eNB 22081 B2, B12, B66 (this page)
- T-Mobile LTE eNB 101348 B2
- T-Mobile GSM LAC 11029 NB 3466
- No T-Mobile B41 or B71
- No T-Mobile NR (as of March 3, 2023)
- AT&T LTE eNB 382057
- Dish
Across the street: Verizon LTE eNB 16687
Permits/registration
PPR. Building department Plan: C166581
- Submitted 9/14/2022
FCC ARS 2671994
- constructed 07/30/2005
Upgrade notes
March 8, 2023: Bell tower is open for upgrade.
March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.)