Difference between revisions of "234 20 6573"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
'''17th August 2021'''<br>''5G n78 activated. Backhaul upgrade still required.''<br> | '''17th August 2021'''<br>''5G n78 activated. Backhaul upgrade still required.''<br> | ||
'''18th January 2022'''<br>''5G n78 B/W increased from 40Mhz to 100Mhz. ARFCN 640548.''<br> | '''18th January 2022'''<br>''5G n78 B/W increased from 40Mhz to 100Mhz. ARFCN 640548.''<br> | ||
'''15th February 2023'''<br>''Second 5G n78 carrier added. 30mhz. ARFCN 632666.''<br> | '''15th February 2023'''<br>''Second 5G n78 carrier added. B/W 30mhz. ARFCN 632666.''<br> | ||
'''15th February 2023'''<br>''Backhaul | '''15th February 2023'''<br>''Backhaul Upgraded.<br>-- 4G reaching max speeds of 300Meg.<br>-- 5G reaching max speeds of 900Meg.''<br> | ||
<br> | <br> | ||
<u>'''Notes'''</u><br> | <u>'''Notes'''</u><br> | ||
None.<br> | None.<br> | ||
<br> | <br> | ||
''Information correct as of | ''Information correct as of 26th February 2023.''</span> |
Revision as of 01:35, 26 March 2023
eNB 6573 Information
Operator | Three UK
Vendor | Huawei
Bands | Band 1, 3, 20, 32 + n78
Mast Type | Monopole / Phase 8
Timeline
17th May 2016
Phase 4 monopole removed
17th May 2016
Phase 5 monopole installed.
28th March 2021
Phase 8 monopole installed.
1st April 2021
Phase 8 brought online.
-- Bands 1, 3, 20 + 32 (4G), 4x4 MIMO. 5G Inactive.
17th August 2021
5G n78 activated. Backhaul upgrade still required.
18th January 2022
5G n78 B/W increased from 40Mhz to 100Mhz. ARFCN 640548.
15th February 2023
Second 5G n78 carrier added. B/W 30mhz. ARFCN 632666.
15th February 2023
Backhaul Upgraded.
-- 4G reaching max speeds of 300Meg.
-- 5G reaching max speeds of 900Meg.
Notes
None.
Information correct as of 26th February 2023.