Difference between revisions of "234 20 4629"
Jump to navigation
Jump to search
(Created page with "frameless|Streetworks P4 Original site was a 3 UK until around 2015 and now shared with EE No operators are broadcasting 5G on this site. 3 UK...") |
|||
Line 1: | Line 1: | ||
Original site was a 3 only until around 2015 and now is shared with EE | |||
2008-mid 2015 Hutchinson ultra slimline monopole (3G only) | |||
mid 2015-2021 Phase 4 (3G/4G) | |||
Mid 2022-Now Phase 8 (3G/4G/5G) 3G will end around September/November 2024. | |||
Revision as of 15:32, 14 July 2024
Original site was a 3 only until around 2015 and now is shared with EE
2008-mid 2015 Hutchinson ultra slimline monopole (3G only) mid 2015-2021 Phase 4 (3G/4G) Mid 2022-Now Phase 8 (3G/4G/5G) 3G will end around September/November 2024.