Difference between revisions of "262 2 10065"
Jump to navigation
Jump to search
(Created page with "On the nothern end of Maximilan-Kaller-Straße, Lankwitz, Vodafone has put a 2G/3G/4G site on top of a big housing block. File:VF-max-kaller-lankw|200px|thumb|left|seen fro...") |
|||
Line 1: | Line 1: | ||
On the nothern end of Maximilan-Kaller-Straße, Lankwitz, Vodafone has put a 2G/3G/4G site on top of a big housing block. | On the nothern end of Maximilan-Kaller-Straße, Lankwitz, Vodafone has put a 2G/3G/4G site on top of a big housing block. | ||
[[File:VF-max-kaller-lankw|200px|thumb|left|seen from the crossing Maximilan-Kaller-Straße/Westkammstraße]] | [[File:VF-max-kaller-lankw.jpg|200px|thumb|left|seen from the crossing Maximilan-Kaller-Straße/Westkammstraße]] |