Difference between revisions of "234 20 6573"
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
<span style="font-size:1"><u>'''eNB 6573 Information'''</u><br> | <span style="font-size:1"><u>'''eNB 6573 Information'''</u><br> | ||
'''Operator''' | ''Three UK''<br> | '''Operator''' | ''Three UK''<br> | ||
'''Vendor''' | '' | '''Vendor''' | ''Ericsson''<br> | ||
'''Bands''' | ''Band 1, 3, 20 + | '''Bands''' | ''Band 1, 3, 20, 32 + n78 (x2)''<br> | ||
'''Mast Type''' | ''Monopole / Phase 8''<br> | '''Mast Type''' | ''Monopole / Phase 8''<br> | ||
<br> | <br> | ||
<u>'''Timeline'''</u><br> | <u>'''Timeline'''</u><br> | ||
'''17th May 2016'''<br>''Phase 4 monopole removed''<br> | '''17th May 2016'''<br>''Phase 4 monopole removed''<br> | ||
'''17th May 2016'''<br>''Phase 5 monopole installed | '''17th May 2016'''<br>''Phase 5 monopole installed.''<br> | ||
'''28th March 2021'''<br>''Phase 8 | '''28th March 2021'''<br>''Phase 8 monopole installed.''<br> | ||
'''1st April 2021'''<br>''Phase 8 brought online.<br>-- Bands 1, 3, 20 + 32 (4G), 4x4 MIMO. 5G Inactive.''<br> | '''1st April 2021'''<br>''Phase 8 brought online.<br>-- Bands 1, 3, 20 + 32 (4G), 4x4 MIMO. 5G Inactive.''<br> | ||
'''17th August 2021'''<br>''5G n78 activated. Backhaul upgrade still required.''<br> | |||
'''18th January 2022'''<br>''5G n78 B/W increased from 40Mhz to 100Mhz. ARFCN 640548.''<br> | |||
'''15th February 2023'''<br>''Second 5G n78 carrier added. B/W 30Mhz. ARFCN 632666.''<br> | |||
'''15th February 2023'''<br>''Backhaul Upgraded. Max speeds of about 900Meg (up from 300Meg).''<br> | |||
'''19th June 2023'''<br>''Huawei >> Ericsson Hardware Swap''<br>''-- 5G N78 100Mhz / ARFCN 640548 carrier removed.''<br>''-- 5G N78 30Mhz / ARFCN 632666 carrier removed.''<br>''-- 4G B28 10Mhz / ARFCN 9360 carrier added.''<br>''-- 5G N78 100Mhz / ARFCN 641376 carrier added.''<br>''-- 5G N78 40Mhz / ARFCN 631392 carrier added.''<br> | |||
<br> | <br> | ||
<u>'''Notes'''</u><br> | <u>'''Notes'''</u><br> | ||
None.<br> | |||
<br> | <br> | ||
''Information correct as of | ''Information correct as of 11th July 2023.''</span> |
Latest revision as of 19:35, 11 July 2023
eNB 6573 Information
Operator | Three UK
Vendor | Ericsson
Bands | Band 1, 3, 20, 32 + n78 (x2)
Mast Type | Monopole / Phase 8
Timeline
17th May 2016
Phase 4 monopole removed
17th May 2016
Phase 5 monopole installed.
28th March 2021
Phase 8 monopole installed.
1st April 2021
Phase 8 brought online.
-- Bands 1, 3, 20 + 32 (4G), 4x4 MIMO. 5G Inactive.
17th August 2021
5G n78 activated. Backhaul upgrade still required.
18th January 2022
5G n78 B/W increased from 40Mhz to 100Mhz. ARFCN 640548.
15th February 2023
Second 5G n78 carrier added. B/W 30Mhz. ARFCN 632666.
15th February 2023
Backhaul Upgraded. Max speeds of about 900Meg (up from 300Meg).
19th June 2023
Huawei >> Ericsson Hardware Swap
-- 5G N78 100Mhz / ARFCN 640548 carrier removed.
-- 5G N78 30Mhz / ARFCN 632666 carrier removed.
-- 4G B28 10Mhz / ARFCN 9360 carrier added.
-- 5G N78 100Mhz / ARFCN 641376 carrier added.
-- 5G N78 40Mhz / ARFCN 631392 carrier added.
Notes
None.
Information correct as of 11th July 2023.