Difference between revisions of "234 30 20171"

From CellMapper Wiki
Jump to navigation Jump to search
(Created page with "Planning Permission Authority: <br> Highland Council Planning Permission Issued: <br> Tue 13 May 2003 Planning Permission REF: <br> [https://wam.highland.gov.uk/wam/applicat...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Planning Permission Authority: <br>
Planning Permission Authority: <br>
Highland Council
Highland Council <br>
 
Planning Permission Issued: <br>
Tue 13 May 2003


Planning Permission REF: <br>
Planning Permission REF: <br>
[https://wam.highland.gov.uk/wam/applicationDetails.do?activeTab=summary&keyVal=0300161TELCA 03/00161/TELCA]
[https://wam.highland.gov.uk/wam/applicationDetails.do?activeTab=summary&keyVal=0300161TELCA 03/00161/TELCA] <br>


Description: <br>
Description: <br>
telecommunications mast to include 6 (2g) antennas, 3 (3g) antennas and 2 transmission dishes with associated ancillary development
telecommunications mast to include 6 (2g) antennas, 3 (3g) antennas and 2 transmission dishes with associated ancillary development <br>


Image [2023]: <br>
Image [2023]: <br>
[[File:EE scrabster.jpg|frameless]]
N/A <br>


Notes: <br>
Notes: <br>
Originally an T-Mobile UK 2G & 3G site (Later merged with Orange PCS UK to form EE) May have 3G switched off
Originally an T-Mobile (UK) 2G & 3G site (Later merged with Orange (UK) to form EE) <br>


Related Technologies On This Mast (Same Operator): <br>
Mast Shared With: <br>
2G: [Not Located] <br>
3 (UK) <br>
3G: [N/A] <br>
4G: [This Mast] <br>
5G: [N/A] <br>

Latest revision as of 13:21, 8 September 2023

Planning Permission Authority:
Highland Council

Planning Permission REF:
03/00161/TELCA

Description:
telecommunications mast to include 6 (2g) antennas, 3 (3g) antennas and 2 transmission dishes with associated ancillary development

Image [2023]:
N/A

Notes:
Originally an T-Mobile (UK) 2G & 3G site (Later merged with Orange (UK) to form EE)

Mast Shared With:
3 (UK)