Difference between revisions of "262 3 23152"

23 bytes added ,  04:55, 15 December 2021
no edit summary
Line 1: Line 1:
At An den Klostergärten/Malteserstraße 170/172 o2 has built its site consisting of three passive sector antennas plus three active MaMiMo antenna panels of the site on top of this futuristic-looking building. The site was finished rebuilding with new B3-enabled panels in June 2019. In 2021 the Kathrein antenna panels seen on the pictures from 2020 were replaced by the Massive MiMo Panels.
At An den Klostergärten/Malteserstraße 170/172 o2 has built its site consisting of three passive sector antennas plus three active MaMiMo antenna panels of the site on top of this futuristic-looking building. The site was finished rebuilding with new B3-enabled panels in June 2019. In 2021 the Kathrein antenna panels seen on the pictures from 2020 were replaced by the Massive MiMo Panels.


Seen from the east at An den Klostergärten:
Seen from the south and east respectively at An den Klostergärten:


[[File:Ezgif-5-c024bc43cbba.gif|786px]]
[[File:Ezgif-5-c024bc43cbba.gif|786px]]
3,658

edits