Difference between revisions of "262 3 20349"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
o2 rebuilt its site on top of the roof of Osdorfer Straße 42 in Berlin-Lichterfelde in late 2019 and added Massive MiMo panels for 5G-NSA support at Band n78 in late 2021. | |||
[[File:20349o2-se.jpg| | [[File:20349o25G-sw.JPG|786px]] | ||
Rotating clockwise from the south-east to the north-west these are some 2020 views of the site, when it was reconstructed. | |||
[[File:20349o2-se.jpg|786px]] | |||
[[File:20349o2-sw.jpg|786px]] | [[File:20349o2-sw.jpg|786px]] |
Latest revision as of 07:32, 22 December 2021
o2 rebuilt its site on top of the roof of Osdorfer Straße 42 in Berlin-Lichterfelde in late 2019 and added Massive MiMo panels for 5G-NSA support at Band n78 in late 2021.
Rotating clockwise from the south-east to the north-west these are some 2020 views of the site, when it was reconstructed.
Before the reconstruction of the site in late 2019 the antennas used to be mounted right below the roof.