Difference between revisions of "234 10 500473"
Jump to navigation
Jump to search
(Created page with "'''05/11/2021:''' Installed Commscope cabinet for new Orion build. Likely dual-operator Orion.") |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''01/11/2021:''' Begin streetworks for new monopole installation in Marchant's Way to replace 234/10 eNB 500473 | |||
'''05/11/2021:''' Installed Commscope cabinet for new Orion build. Likely dual-operator Orion. | '''05/11/2021:''' Installed Commscope cabinet for new Orion build. Likely dual-operator Orion. | ||
'''13/11/2021 - 15/11/2021''': Electrics installation for Orion monopole. | |||
'''13/12/2021''': Orion monopole rigging | |||
'''14/12/2021 - 17/12/2021''': Orion monopole cabling. | |||
'''21/12/2021''': Orion live with confirmed B1/B20/n28. Other bands to be confirmed. | |||
'''02/01/2022''': Confirmed B8 and B40x2 | |||
{{strikethrough|'''30/01/2022''': n78 AAU install to be completed with cherrypicker.}} |
Latest revision as of 00:39, 6 March 2022
01/11/2021: Begin streetworks for new monopole installation in Marchant's Way to replace 234/10 eNB 500473
05/11/2021: Installed Commscope cabinet for new Orion build. Likely dual-operator Orion.
13/11/2021 - 15/11/2021: Electrics installation for Orion monopole.
13/12/2021: Orion monopole rigging
14/12/2021 - 17/12/2021: Orion monopole cabling.
21/12/2021: Orion live with confirmed B1/B20/n28. Other bands to be confirmed.
02/01/2022: Confirmed B8 and B40x2
30/01/2022: n78 AAU install to be completed with cherrypicker.