'''01/11/2021:'''Begin streetworks for new monopole installation in Marchant's Way to replace 234/10 eNB 500473
'''01/11/2021:''' Begin streetworks for new monopole installation in Marchant's Way to replace 234/10 eNB 500473


'''05/11/2021:''' Installed Commscope cabinet for new Orion build. Likely dual-operator Orion.
'''05/11/2021:''' Installed Commscope cabinet for new Orion build. Likely dual-operator Orion.
'''13/11/2021 - 15/11/2021''': Electrics installation for Orion monopole.
'''13/12/2021''': Orion monopole rigging
'''14/12/2021 - 17/12/2021''': Orion monopole cabling.
'''21/12/2021''': Orion live with confirmed B1/B20/n28. Other bands to be confirmed.
'''02/01/2022''': Confirmed B8 and B40x2
{{strikethrough|'''30/01/2022''': n78 AAU install to be completed with cherrypicker.}}

Latest revision as of 00:39, 6 March 2022

01/11/2021: Begin streetworks for new monopole installation in Marchant's Way to replace 234/10 eNB 500473

05/11/2021: Installed Commscope cabinet for new Orion build. Likely dual-operator Orion.

13/11/2021 - 15/11/2021: Electrics installation for Orion monopole.

13/12/2021: Orion monopole rigging

14/12/2021 - 17/12/2021: Orion monopole cabling.

21/12/2021: Orion live with confirmed B1/B20/n28. Other bands to be confirmed.

02/01/2022: Confirmed B8 and B40x2

30/01/2022: n78 AAU install to be completed with cherrypicker.