Difference between revisions of "310 410 371159"

From CellMapper Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
According to permit filings, this site is on a temporary monopole while a permanent tower built by Towerco 2013 is built next to the temporary site. See City of Lincoln permit filing #B2200203.  
This was a temporary monopole site active from early 2022 through late 2023 on a temporary monopole while a permanent tower built by Towerco 2013 was being built next to the temporary site. Refer to City of Lincoln permit filing #B2200203.  
As of July 2023 it looked like AT&T antennas were on the permanent site but not removed from the temporary monopole, which was also still standing.
 
As of July 2023 it looked like AT&T antennas were on the permanent site but not removed from the temporary monopole, which was also still standing. The permanent site became eNB 371131 in fall 2023.


Photo date 5/1/2022.
Photo date 5/1/2022.
[[File:ATT 371159.jpg|thumb]]
[[File:ATT 371159.jpg|thumb]]

Latest revision as of 19:25, 24 November 2023

This was a temporary monopole site active from early 2022 through late 2023 on a temporary monopole while a permanent tower built by Towerco 2013 was being built next to the temporary site. Refer to City of Lincoln permit filing #B2200203.

As of July 2023 it looked like AT&T antennas were on the permanent site but not removed from the temporary monopole, which was also still standing. The permanent site became eNB 371131 in fall 2023.

Photo date 5/1/2022.

ATT 371159.jpg