(Created page with "Site is on a temporary monopole while permanent tower built by Towerco 2013 is built next to the temporary site. See City of Lincoln permit filing #B2200203.")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Site is on a temporary monopole while permanent tower built by Towerco 2013 is built next to the temporary site. See City of Lincoln permit filing #B2200203.
This was a temporary monopole site active from early 2022 through late 2023 on a temporary monopole while a permanent tower built by Towerco 2013 was being built next to the temporary site. Refer to City of Lincoln permit filing #B2200203.  
 
As of July 2023 it looked like AT&T antennas were on the permanent site but not removed from the temporary monopole, which was also still standing. The permanent site became eNB 371131 in fall 2023.
 
Photo date 5/1/2022.
[[File:ATT 371159.jpg|thumb]]

Latest revision as of 19:25, 24 November 2023

This was a temporary monopole site active from early 2022 through late 2023 on a temporary monopole while a permanent tower built by Towerco 2013 was being built next to the temporary site. Refer to City of Lincoln permit filing #B2200203.

As of July 2023 it looked like AT&T antennas were on the permanent site but not removed from the temporary monopole, which was also still standing. The permanent site became eNB 371131 in fall 2023.

Photo date 5/1/2022.