Difference between revisions of "310 260 1079824"

From CellMapper Wiki
Jump to navigation Jump to search
(→‎Speed test: add signal stats)
(add permit info)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
This site has a set of monopoles, and this page is about T-Mobile gNB 1079824
This site has a set of monopoles at [https://www.google.com/maps/@38.9163754,-104.7182059,851m/data=!3m1!1e3 38.917196723077076, -104.72004449421095] (Powers/Lois Ln/Templeton Gap), and this page is about T-Mobile gNB 1079824


== Photo ==  
== Photo ==  
Line 6: Line 6:


Google [https://www.google.com/maps/@38.9171474,-104.7197294,3a,56.3y,277.37h,116.95t/data=!3m6!1e1!3m4!1sG63daAjtvjCw62UGZgw0ew!2e0!7i16384!8i8192 Street View photo]
Google [https://www.google.com/maps/@38.9171474,-104.7197294,3a,56.3y,277.37h,116.95t/data=!3m6!1e1!3m4!1sG63daAjtvjCw62UGZgw0ew!2e0!7i16384!8i8192 Street View photo]
Tower IDs (thank you to multiple people in the [https://www.reddit.com/r/cellmapper/comments/1202qd7/6_tower_ids_please_see_also_captions/ reddit discussion]):
* Top left: "Old Verizon ALU"
* Bottom left: "legacy carrier, maybe Cricket"
* Top right: "T-Mobile Nokia, midband only (with n41)...AEHC"
* Bottom right: "ATT Nokia/ALU"


== Speed test ==
== Speed test ==
Line 57: Line 63:
     },
     },
</nowiki>
</nowiki>
== Permits ==
PPRBD permits at 6131 TEMPLETON GAP RD:
* [https://www.pprbd.org/Permit/Details?permitNo=P03836 Permit P03836]: open permit as of December 2023
* [https://www.pprbd.org/Permit/Details?permitNo=N94575 Permit N94575]: February 2022 to May 2022. This coincides with the date the cell tower appeared on CellMapper, so it was when T-Mobile was co-located here.


[[Category:T-Mobile in El Paso County Colorado]]
[[Category:T-Mobile in El Paso County Colorado]]
[[Category:speed test]]
[[Category:speed test]]
[[Category:TMHI speed test]]
[[Category:TMHI speed test]]

Latest revision as of 05:15, 26 December 2023

This site has a set of monopoles at 38.917196723077076, -104.72004449421095 (Powers/Lois Ln/Templeton Gap), and this page is about T-Mobile gNB 1079824

Photo

photo taken 3/12/2023 from Powers Blvd

Google Street View photo

Tower IDs (thank you to multiple people in the reddit discussion):

  • Top left: "Old Verizon ALU"
  • Bottom left: "legacy carrier, maybe Cricket"
  • Top right: "T-Mobile Nokia, midband only (with n41)...AEHC"
  • Bottom right: "ATT Nokia/ALU"

Speed test

Except the February speed test, all were at close range from Lous Ln.

Date Device Connection Download (mbps) Upload (mbps) Latency (ms) Note
02/01/23 Galaxy S22 NR SA with N25 (15MHz) 122 23.4 70 Google Fi near King Soopers
03/12/23 Arcadyan KVD21 Phone by wifi 499.63 68.16 23 https://www.speedtest.net/result/a/9126839182
03/12/23 Arcadyan KVD21 Phone by wifi 518.25 60.04 22 https://www.speedtest.net/result/a/9126841542
03/12/23 Arcadyan KVD21 Laptop by wifi 466.5 42.96 13 https://www.speedtest.net/result/d/e507130a-a165-4c56-b28f-68f3172f3ff4
03/12/23 Arcadyan KVD21 Laptop by wifi 508.52 33.42 13 https://www.speedtest.net/result/d/2e84f98a-3da6-48fe-b736-eb38ccffb8ea
03/12/23 Arcadyan KVD21 Laptop by ethernet 452.39 87.71 14 https://www.speedtest.net/result/d/281b7064-4fd2-4f90-a5b5-994930bbe1fa
03/12/23 Galaxy A13 545.19 90.26 69 https://www.speedtest.net/result/a/9126847123

Signal stats for Arcadyan

"4g": {
      "bands": [
        "b2"
      ],
      "bars": 5.0,
      "cid": 13,
      "eNBID": 123874,
      "rsrp": -69,
      "rsrq": -13,
      "rssi": -56,
      "sinr": 16
    },
    "5g": {
      "bands": [
        "n41"
      ],
      "bars": 5.0,
      "cid": 0,
      "gNBID": 0,
      "rsrp": -60,
      "rsrq": -10,
      "rssi": -47,
      "sinr": 26
    },

Permits

PPRBD permits at 6131 TEMPLETON GAP RD:

  • Permit P03836: open permit as of December 2023
  • Permit N94575: February 2022 to May 2022. This coincides with the date the cell tower appeared on CellMapper, so it was when T-Mobile was co-located here.