Difference between revisions of "310 260 22081"

From CellMapper Wiki
Jump to navigation Jump to search
(Add, clarify, organize)
(add alternative FCC id)
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
This is a cell site. I think it was concealed in a bell tower at a church, but now it's on the roof?
This is a cell site at Springs Community Church at Lexington Dr and Woodmen Road.
 
This photo was taken 3/18/2023 during upgrades for Dish and T-Mobile. (Identification thanks to [https://www.reddit.com/r/cellmapper/comments/1202qd7/6_tower_ids_please_see_also_captions/ reddit discussion]).
 
[[File:20230318_160226 T-Mobile eNB 22081 open bell tower.jpg|400px|open bell tower as of 3/18/2023]]
 
On 2023-03-08, the bell tower was open. It looks like new Dish on top and old equipment on bottom. The color is off because it was taken at night.
 
[[File:2023-03-08 Springs Community Church tower.jpg|400px|taken 2023-03-08]]
 
These are photos that were taken March 3, 2023. The signs in one photo mention Rangewood and Dublin, but those are not the closest crossroads. There is cell equipment in the bell tower too.
 
<gallery>
File:20230303_074850b Springs Community South East.jpg|AT&T on the southeast side
File:20230303_074908 Springs Community South East.jpg|Sprint on the southeast side
File:20230303_074935 Springs Community South.jpg
File:20230303_074954 Springs Community.jpg
File:20230303_075128 Springs Community NW.jpg|electrical on NW side
File:20230303_075145 Springs Community NW.jpg
File:20230303_075214 Springs Community tower.jpg|cell equipment in belltower
File:20230303_075059b Springs Community NW.jpg|electrical on NW side
</gallery>
 
Carrier identification thanks to u/thisisausername190 on [https://www.reddit.com/r/cellmapper/comments/11kinxx/carrier_identification_colorado_see_captions/ reddit]
 
[https://www.google.com/maps/@38.9366929,-104.7624097,3a,75y,149.75h,103.77t/data=!3m6!1e1!3m4!1sgwh6lC4EC3sDRXC0u9ezYQ!2e0!7i16384!8i8192 Google Street View photos] has photos from September 2007 to September 2022.
 
 


== Physically at this site ==
== Physically at this site ==
Line 5: Line 32:
* T-Mobile LTE eNB 22081 B2, B12, B66 (this page)
* T-Mobile LTE eNB 22081 B2, B12, B66 (this page)
* T-Mobile LTE eNB 101348 B2
* T-Mobile LTE eNB 101348 B2
* T-Mobile GSM LAC 11029 NB 3466
* No T-Mobile B41 or B71
* No T-Mobile B41 or B71
* No T-Mobile NR (as of February 18, 2023)
* No T-Mobile NR (as of March 3, 2023)
* AT&T LTE eNB 382057
* AT&T LTE [[310_410_382057|eNB 382057]]
* Dish
 
Across the street: Verizon LTE eNB [[311_480_16687|16687]].


Across the street: Verizon LTE eNB 16687
== Speed tests ==
 
All at close range, Google Fi, March 2023 after T-Mobile upgrade:
 
{| class="wikitable sortable"
! Device !! Connection !! Latency (ms) !! Download (Mbps) !! Upload (Mbps) !! Link
|-
| Galaxy S22 || NR NSA || 59 || 585.5 || 96.6 || https://www.speedtest.net/my-result/a/9171129258
|-
| Galaxy S22 || NR NSA || 74 || 561.9 || 111.6 || https://www.speedtest.net/my-result/a/9171139564
|-
| Galaxy S22 || NR SA || 76 || 523.2 || 13.4 || https://www.speedtest.net/my-result/a/9171134412
|-
| Galaxy S22 || NR SA || 75 || 517.9 || 10.2 || https://www.speedtest.net/my-result/a/9171135634
|}
 
NR SA: N41+N25+N41 (100+20+40MHz).


== Permits/registration ==
== Permits/registration ==
Line 17: Line 64:
* Submitted 9/14/2022
* Submitted 9/14/2022


FCC ARS [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2671994 2671994]
FCC ARS [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2671994 2671994] aka [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2671994 1272647]


* constructed 07/30/2005
* constructed 07/30/2005
== Upgrade notes ==
March 8, 2023: Bell tower is open for upgrade.
March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.) Broadcasting 5G NR for first time.
March 30, 2023: Bell tower closed.
[[Category:T-Mobile in El Paso County Colorado]]

Latest revision as of 04:16, 10 February 2024

This is a cell site at Springs Community Church at Lexington Dr and Woodmen Road.

This photo was taken 3/18/2023 during upgrades for Dish and T-Mobile. (Identification thanks to reddit discussion).

open bell tower as of 3/18/2023

On 2023-03-08, the bell tower was open. It looks like new Dish on top and old equipment on bottom. The color is off because it was taken at night.

taken 2023-03-08

These are photos that were taken March 3, 2023. The signs in one photo mention Rangewood and Dublin, but those are not the closest crossroads. There is cell equipment in the bell tower too.

Carrier identification thanks to u/thisisausername190 on reddit

Google Street View photos has photos from September 2007 to September 2022.


Physically at this site

  • T-Mobile LTE eNB 22081 B2, B12, B66 (this page)
  • T-Mobile LTE eNB 101348 B2
  • T-Mobile GSM LAC 11029 NB 3466
  • No T-Mobile B41 or B71
  • No T-Mobile NR (as of March 3, 2023)
  • AT&T LTE eNB 382057
  • Dish

Across the street: Verizon LTE eNB 16687.

Speed tests

All at close range, Google Fi, March 2023 after T-Mobile upgrade:

Device Connection Latency (ms) Download (Mbps) Upload (Mbps) Link
Galaxy S22 NR NSA 59 585.5 96.6 https://www.speedtest.net/my-result/a/9171129258
Galaxy S22 NR NSA 74 561.9 111.6 https://www.speedtest.net/my-result/a/9171139564
Galaxy S22 NR SA 76 523.2 13.4 https://www.speedtest.net/my-result/a/9171134412
Galaxy S22 NR SA 75 517.9 10.2 https://www.speedtest.net/my-result/a/9171135634

NR SA: N41+N25+N41 (100+20+40MHz).

Permits/registration

PPR. Building department Plan: C166581

  • Submitted 9/14/2022

FCC ARS 2671994 aka 1272647

  • constructed 07/30/2005


Upgrade notes

March 8, 2023: Bell tower is open for upgrade.

March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.) Broadcasting 5G NR for first time.

March 30, 2023: Bell tower closed.