Difference between revisions of "234 30 20516"
Jump to navigation
Jump to search
(6 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
'''1st April 2021'''<br>''Phase 8 brought online. Still 4G 2x2 MIMO B3 + B20 only.<br>-- Bigger rollout/upgrade on Three UK. See eNB 6573.''<br> | '''1st April 2021'''<br>''Phase 8 brought online. Still 4G 2x2 MIMO B3 + B20 only.<br>-- Bigger rollout/upgrade on Three UK. See eNB 6573.''<br> | ||
'''9th July 2022'''<br>''Secondary 2x2 MIMO B3 carrier added.<br>-- 10Mhz / EARFCN 1761.''<br> | '''9th July 2022'''<br>''Secondary 2x2 MIMO B3 carrier added.<br>-- 10Mhz / EARFCN 1761.''<br> | ||
'''16th June 2023'''<br>''Minor 4G Carrier Changes.''<br>-- ''4G B3 10Mhz / EARFCN 1761 carrier removed.<br>-- 4G B3 20Mhz / EARFCN 1815 carrier added.''<br> | |||
<br> | <br> | ||
<u>'''Notes'''</u><br> | <u>'''Notes'''</u><br> | ||
''No native 5G.''<br> | |||
''No native 5G | |||
<br> | <br> | ||
''Information correct as of | ''Information correct as of 30th September 2024''</span> |
Latest revision as of 22:04, 12 October 2024
eNB 20516 Information
Operator | EE
Vendor | Nokia
Bands | Band 3 (x2) + 20
Mast Type | Monopole / Phase 8
Timeline
17th May 2016
Phase 4 monopole removed
17th May 2016
Phase 5 monopole installed. 4G Added.
28th March 2021
Phase 8 monopole installed.
1st April 2021
Phase 8 brought online. Still 4G 2x2 MIMO B3 + B20 only.
-- Bigger rollout/upgrade on Three UK. See eNB 6573.
9th July 2022
Secondary 2x2 MIMO B3 carrier added.
-- 10Mhz / EARFCN 1761.
16th June 2023
Minor 4G Carrier Changes.
-- 4G B3 10Mhz / EARFCN 1761 carrier removed.
-- 4G B3 20Mhz / EARFCN 1815 carrier added.
Notes
No native 5G.
Information correct as of 30th September 2024