Difference between revisions of "Talk:234 15 11449"

From CellMapper Wiki
Jump to navigation Jump to search
(Created page with "Would be good to have some background info about this site too ~~~~")
 
Tags: Mobile edit Mobile web edit
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
Would be good to have some background info about this site too [[User:Frvic93|Frvic93]] ([[User talk:Frvic93|talk]]) 02:05, 2 December 2024 (UTC)
Would be good to have some background info about this site too [[User:Frvic93|Frvic93]] ([[User talk:Frvic93|talk]]) 02:05, 2 December 2024 (UTC)
----
Not putting all details on the main page but:
- eNB seems to have been broadcasting from the old VF panels on the roof, which were never removed
- O2 didn't submit anything to the council until mid-2018 (18/03569/FUL), I assume VF got sick of waiting and did a radio swap of their own to have 4G in the area
- When O2 finally did their upgrade oin mid-2019, they didn't put in VF radios, presumably because VF already had their own
- In late 2019, O2 submitted another notification to the council to upgrade the site with band 40, passive n78 and finally put VF on their antennas (19/05241/PNT)
- The tower got upgraded in 2021, when the other VF eNB on the building got turned on
- Now this mast is looking to get unwound. 3 applications were sent in (one each year), but kept getting withdrawn and amended until the 2023 one (23/02719/FUL) was accepted
- The last application is finally going to remove the VF antennae
- I checked today and the old eNB is finally off. I believe the old panels are off too (didn't check 2G, which may still be broadcasting from them), in preparation for the unwind
No idea when the unwind's happening. 11450 is a similar story, but O2 were never on it (though when this is upgraded, O2 will go on it as well: 22/02192/FUL). - [[User:DirtyRat583|DirtyRat583]], 21:21, 07 December 2024
Now that's a summary and a half! Thanks for the information [[User:Frvic93|Frvic93]] ([[User talk:Frvic93|talk]]) 23:06, 7 December 2024 (UTC)

Latest revision as of 23:06, 7 December 2024

Would be good to have some background info about this site too Frvic93 (talk) 02:05, 2 December 2024 (UTC)


Not putting all details on the main page but:

- eNB seems to have been broadcasting from the old VF panels on the roof, which were never removed

- O2 didn't submit anything to the council until mid-2018 (18/03569/FUL), I assume VF got sick of waiting and did a radio swap of their own to have 4G in the area

- When O2 finally did their upgrade oin mid-2019, they didn't put in VF radios, presumably because VF already had their own

- In late 2019, O2 submitted another notification to the council to upgrade the site with band 40, passive n78 and finally put VF on their antennas (19/05241/PNT)

- The tower got upgraded in 2021, when the other VF eNB on the building got turned on

- Now this mast is looking to get unwound. 3 applications were sent in (one each year), but kept getting withdrawn and amended until the 2023 one (23/02719/FUL) was accepted

- The last application is finally going to remove the VF antennae

- I checked today and the old eNB is finally off. I believe the old panels are off too (didn't check 2G, which may still be broadcasting from them), in preparation for the unwind

No idea when the unwind's happening. 11450 is a similar story, but O2 were never on it (though when this is upgraded, O2 will go on it as well: 22/02192/FUL). - DirtyRat583, 21:21, 07 December 2024

Now that's a summary and a half! Thanks for the information Frvic93 (talk) 23:06, 7 December 2024 (UTC)