Difference between revisions of "234 10 524948"

From CellMapper Wiki
Jump to navigation Jump to search
(added info)
 
 
Line 1: Line 1:
Near the end of 2016 they built a 12.5m pandora dual stack however sometime in 2020 it was replaced with a 15m elara dual stack.
15m green elara dual stack column, built in mid 2020.


Its also possible that O2 B8/900Mhz and B40/L23 is active.
As of 03/12/2024 only b3 + b20 is active.

Latest revision as of 19:08, 3 December 2024

15m green elara dual stack column, built in mid 2020.

As of 03/12/2024 only b3 + b20 is active.