Difference between revisions of "262 3 22000 5596"

Jump to navigation Jump to search
 
Line 1: Line 1:
At An den Klostergärten/Malteserstraße 170/172 o2 has built its three sectors antennas of the 2G/3G/4G site on top of this futuristic-looking building. The site was finished rebuilding with new panels in June 2019.
At An den Klostergärten/Malteserstraße 170/172 o2 has built its three sector antennas of the 2G/3G/4G site on top of this futuristic-looking building. The site was finished rebuilding with new panels in June 2019.


Seen from the south at An den Klostergärten:
Seen from the south at An den Klostergärten: