Difference between revisions of "262 3 21869"

Jump to navigation Jump to search
Line 1: Line 1:
o2's B3+20 site replaces a site nearby, on the same block, which at March 24, 2019 was still visible.
o2's B3+20 site replaces a site nearby, on the same block, which at March 24, 2019 was still visible. At late 2019 the old o2 antennas had disappeared and Telekom, who will take the old site, appears to have installed its two panels.


Rear view from the south-east, at Kleingartenanlage "Feierabend":
Rear view from the south-east, at Kleingartenanlage "Feierabend":


[[File:21869o2-Ullsteinstr-Tempelhof.JPG|1400px]]
[[File:21869o2-Ullsteinstr-Tempelhof.JPG|1400px]]