Difference between revisions of "262 3 20363"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
[[File:13866VF-186o2-sw.jpg|1400px]] | [[File:13866VF-186o2-sw.jpg|1400px]] | ||
Construction works on the old o2 panels in late February 2019; seen from south at Am Elsenbruch (two of the vodafone antennas on the right): | Construction works on the old o2 panels in late February 2019; seen from south at Am Elsenbruch (two of the vodafone antennas on the right): | ||
[[File:VF-teltowkanalstr-lankw-work-south.jpg|1400px]] | [[File:VF-teltowkanalstr-lankw-work-south.jpg|1400px]] |
Revision as of 18:09, 26 November 2019
Rigth next to the Vodafone site, o2 has a site, that is sending out 3G for some time and since September 2019 LTE on Band 3 as well. The 3 antennas are at one mast at Am Elsenbruch 5 close to the crossing Telowkanalstraße / Am Elsenbruch, which is also very close to o2's 4G site at Siemensstraße.
Rear view from the south-east with the o2 mast to the left, and one of two neighboring Vodafone masts to the right:
Construction works on the old o2 panels in late February 2019; seen from south at Am Elsenbruch (two of the vodafone antennas on the right):