Difference between revisions of "234 30 20516"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
'''28th March 2021'''<br>''Phase 8 monopole installed.''<br> | '''28th March 2021'''<br>''Phase 8 monopole installed.''<br> | ||
'''1st April 2021'''<br>''Phase 8 brought online. Still 4G 2x2 MIMO B3 and B20 only.<br>-- Bigger rollout/upgrade on Three UK. See eNB 6573.''<br> | '''1st April 2021'''<br>''Phase 8 brought online. Still 4G 2x2 MIMO B3 and B20 only.<br>-- Bigger rollout/upgrade on Three UK. See eNB 6573.''<br> | ||
'''9th July 2022'''<br>''Secondary 2x2 MIMO B3 carrier added. 10Mhz / EARFCN 1761.''<br> | '''9th July 2022'''<br>''Secondary 2x2 MIMO B3 carrier added.<br>-- 10Mhz / EARFCN 1761.''<br> | ||
<br> | <br> | ||
<u>'''Notes'''</u><br> | <u>'''Notes'''</u><br> |
Revision as of 15:48, 11 July 2022
eNB 20516 Information
Operator | EE
Vendor | Nokia
Bands | Band 3 (x2) + 20
Mast Type | Monopole / Phase 8
Timeline
17th May 2016
Phase 4 monopole removed
17th May 2016
Phase 5 monopole installed. 4G Added.
28th March 2021
Phase 8 monopole installed.
1st April 2021
Phase 8 brought online. Still 4G 2x2 MIMO B3 and B20 only.
-- Bigger rollout/upgrade on Three UK. See eNB 6573.
9th July 2022
Secondary 2x2 MIMO B3 carrier added.
-- 10Mhz / EARFCN 1761.
Notes
1 | Backhaul is 195Meg BT Wholesale (MEAS).
Information correct as of 11th July 2022