234 30 28977

Revision as of 00:47, 15 September 2024 by Hammy434 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
  • 33m tower
  • EE: G18/L08/L18/L26/L26C2 (24m)
  • O2: G09/U09/L08/L09/L18/L21 (33m)
  • 3: L08/L18/L21 (24m)
  • VF: G09/L08/L09/L21 (33m)
  • EE sector angles (L08) & 3 sector angles: 0°/120°/240°
  • EE sector angles (G18/L18/L26/L26C2): 0°/120°/263°
  • O2 & VF Sector angles: 60°/180°/300°
  • EE & 3 planning reference: P/18/1296/2, P/20/0107/2
  • O2 & VF planning reference: P/15/2488/2 and P/17/2133/2