234 30 20516

Revision as of 15:38, 11 July 2022 by FortKnox (talk | contribs)

eNB 20516 Information
Operator | EE
Vendor | Nokia
Bands | Band 3 + 20
Mast Type | Monopole / Phase 5

Timeline
17th May 2016
Phase 4 monopole removed
17th May 2016
Phase 5 monopole installed. 4G Added.
28th March 2021
Phase 8 monopole installed.
1st April 2021
Phase 8 brought online.
-- Still B1 and B20 only. Bigger rollout/upgrade on Three UK (See eNB 6573)

9th July 2022
Secondary B3 carrier added (EARFCN 1761/10mhz). Backhaul upgrade still required.

Notes
1 | Backhaul is 195Meg BT Wholesale (MEAS).

Information correct as of 11th July 2022