262 3 20349

o2 rebuilt its site on top of the roof of Osdorfer Straße 42 in Berlin-Lichterfelde in late 2019 and added Massive MiMo panels for 5G-NSA support at Band n78 in late 2021.

20349o25G-sw.JPG

Rotating clockwise from the south-east to the north-west these are some 2020 views of the site, when it was reconstructed.

20349o2-se.jpg

20349o2-sw.jpg

20349o2-w.jpg

20349o2-nw.jpg

Before the reconstruction of the site in late 2019 the antennas used to be mounted right below the roof.

22535o2-1.JPG