310 260 22081

This is a cell site at Springs Community Church at Lexington Dr and Woodmen Road.

This photo was taken 3/18/2023 during upgrades for Dish and T-Mobile. (Identification thanks to reddit discussion).

open bell tower as of 3/18/2023

On 2023-03-08, the bell tower was open. It looks like new Dish on top and old equipment on bottom. The color is off because it was taken at night.

taken 2023-03-08

These are photos that were taken March 3, 2023. The signs in one photo mention Rangewood and Dublin, but those are not the closest crossroads. There is cell equipment in the bell tower too.

Carrier identification thanks to u/thisisausername190 on reddit

Google Street View photos has photos from September 2007 to September 2022.


Physically at this site

  • T-Mobile LTE eNB 22081 B2, B12, B66 (this page)
  • T-Mobile LTE eNB 101348 B2
  • T-Mobile GSM LAC 11029 NB 3466
  • No T-Mobile B41 or B71
  • No T-Mobile NR (as of March 3, 2023)
  • AT&T LTE eNB 382057
  • Dish

Across the street: Verizon LTE eNB 16687.

Speed tests

All at close range, Google Fi, March 2023 after T-Mobile upgrade:

Device Connection Latency (ms) Download (Mbps) Upload (Mbps) Link
Galaxy S22 NR NSA 59 585.5 96.6 https://www.speedtest.net/my-result/a/9171129258
Galaxy S22 NR NSA 74 561.9 111.6 https://www.speedtest.net/my-result/a/9171139564
Galaxy S22 NR SA 76 523.2 13.4 https://www.speedtest.net/my-result/a/9171134412
Galaxy S22 NR SA 75 517.9 10.2 https://www.speedtest.net/my-result/a/9171135634

NR SA: N41+N25+N41 (100+20+40MHz).

Permits/registration

PPR. Building department Plan: C166581

  • Submitted 9/14/2022

FCC ARS 2671994 aka 1272647

  • constructed 07/30/2005


Upgrade notes

March 8, 2023: Bell tower is open for upgrade.

March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.) Broadcasting 5G NR for first time.

March 30, 2023: Bell tower closed.