2,309
edits
(added info) |
m (→top) |
||
Line 1: | Line 1: | ||
Dito LTE and 5G NR installed on a lattice tower (August 1, 2024) | Dito LTE and 5G NR installed on a lattice tower (August 1, 2024) | ||
A cluster of 3 sectors in that area, broadcasting LTE700,LTE2100, TDD-LTE2500 and 5G NR SA/NSA per sector. | A cluster of 3 sectors in that area, broadcasting LTE700, LTE2100, TDD-LTE2500 and 5G NR SA/NSA per sector. | ||
Site before 5G NR mast had been added (photographed in October 24, 2023): | Site before 5G NR mast had been added (photographed in October 24, 2023): |
edits