Difference between revisions of "310 260 41223 100328"

329 bytes added ,  16:38, 19 August 2018
no edit summary
(Created page with "T-Mobile operates a very large telecom facility atop the first national bank building. Areas to the east of downtown are only serviced by this site because of NIMBYs blocking...")
Tags: Mobile edit Mobile web edit
 
 
Line 1: Line 1:
T-Mobile operates a very large telecom facility atop the first national bank building. Areas to the east of downtown are only serviced by this site because of NIMBYs blocking expansion of any tower building in the area. https://www.coloradoan.com/story/news/2017/08/17/tower-fight-extends-fort-collins-neighborhoods-cell-reception-woes/555196001/
T-Mobile operates a very large telecom facility atop the First National Bank building (215 W. Oak St). Areas to the east of downtown are only serviced by this site because of NIMBYs [https://www.coloradoan.com/story/news/2017/08/17/tower-fight-extends-fort-collins-neighborhoods-cell-reception-woes/555196001/ blocking expansion] of any tower building in the area.
 
Visibility: This site is clearly visible from ground level near the First National Bank Building.
 
Location verified through [https://amos.fcgov.com/CitizenAccess/Cap/CapDetail.aspx?Module=Planning&TabName=Planning&capID1=15CAP&capID2=00000&capID3=000KN&agencyCode=FTCOLLINS building permit] records.  -Eckels
247

edits