2,308
edits
(update) |
(update) |
||
Line 1: | Line 1: | ||
Smart LTE and 5G NR installed on a lattice tower. ( | Smart LTE and 5G NR installed on a lattice tower. (July 27, 2023) | ||
A cluster of 3 sectors in that area, broadcasting LTE700, LTE1800, LTE2100, TDD-LTE2300 and 5G NR SA/NSA per sector. | A cluster of 3 sectors in that area, broadcasting LTE700, LTE1800, LTE2100, TDD-LTE2300 and 5G NR SA/NSA per sector. | ||
Line 9: | Line 9: | ||
[[file:Smart_eNB_ID_130287.jpg|350px]] | [[file:Smart_eNB_ID_130287.jpg|350px]] | ||
Site after 5G NR mast had been added (photographed in | Site after 5G NR mast had been added (photographed in July 23, 2023): | ||
[[file:Smart eNB ID 130287_(5G mast installed).jpg|350px]] | [[file:Smart eNB ID 130287_(5G mast installed).jpg|350px]] |
edits