234 20 4629

From CellMapper Wiki
Revision as of 15:36, 14 July 2024 by Francisuk1989 (talk | contribs) (fixed)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Original site was a 3 only until around 2015 and now is shared with EE

2008-Mid 2015 Hutchinson ultra slimline monopole (3G only)

2015-2021 Phase 4 (3G/4G)

2021-Now Phase 8 (3G/4G/5G) 3G will end around September/November 2024.