Difference between revisions of "216 1 55"
Jump to navigation
Jump to search
Szamorodni (talk | contribs) |
Szamorodni (talk | contribs) |
||
Line 1: | Line 1: | ||
5G ENDC Available | 5G N78 ENDC Available | ||
First Telenor 5G tower in Budapest (2021.04.28) | First operational Telenor 5G tower in Budapest (2021.04.28) |
Revision as of 10:31, 30 December 2022
5G N78 ENDC Available
First operational Telenor 5G tower in Budapest (2021.04.28)