Difference between revisions of "234 20 10390"

From CellMapper Wiki
Jump to navigation Jump to search
Line 9: Line 9:
'''7th June 2020'''<br>''4x4 MIMO removed resulting in 2x2 MIMO.''<br>
'''7th June 2020'''<br>''4x4 MIMO removed resulting in 2x2 MIMO.''<br>
'''5th July 2020'''<br>''256QAM Enabled (Originally 64QAM only).''<br>
'''5th July 2020'''<br>''256QAM Enabled (Originally 64QAM only).''<br>
'''30th Nov 2020'''<br>''3x 5G Antennas Installed.''<br>
<br>
<br>
<u>'''Notes'''</u><br>
<u>'''Notes'''</u><br>
Line 14: Line 15:
2) No sign of 5G equipment yet.<br>
2) No sign of 5G equipment yet.<br>
<br>
<br>
''Information correct as of October 2020''</span>
''Information correct as of November 2020''</span>

Revision as of 17:04, 30 November 2020

eNB 10390 Information
Operator | Three UK
Vendor | Huawei
Bands | B1, B3, B20, B32
MIMO | 2x2

Timeline
21st Sept 2019
Huawei Re-build. B1, B32 + 4x4 MIMO Added.
7th June 2020
4x4 MIMO removed resulting in 2x2 MIMO.
5th July 2020
256QAM Enabled (Originally 64QAM only).
30th Nov 2020
3x 5G Antennas Installed.

Notes
1) Backhaul still limited to legacy 120/150Meg.
2) No sign of 5G equipment yet.

Information correct as of November 2020