Difference between revisions of "262 3 20541"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
[[File:20541o2-TU-Berlin-Straße.JPG|1400px]] | [[File:20541o2-TU-Berlin-Straße.JPG|1400px]] | ||
Photo from June 2019 before the reconstruction: | |||
[[File:Pre-20541o2-TU-Berlin-Straße.JPG|1400px]] | |||
Seen from the courtyard/campus southern: | Seen from the courtyard/campus southern: | ||
[[File:20541o2-TU-Berlin.JPG|1400px]] | [[File:20541o2-TU-Berlin.JPG|1400px]] | ||
Before the reconstruction: | |||
[[File:Pre-20541o2-TU-Berlin.jpg|1400px]] |
Revision as of 17:53, 6 May 2020
This 3CA site by o2 is installed on the eastern end of the TU Berlin main buildings roof of at Straße des 17. Juni. With the new panels o2 installed in late 2019 this site started emitting LTE with the beginning of late November 2019.
Seen from 8th story of the norhtern math building:
View from the opposite street side of Straße des 17. Juni:
Photo from June 2019 before the reconstruction:
Seen from the courtyard/campus southern:
Before the reconstruction: