Difference between revisions of "262 3 21900 3152"

16 bytes removed ,  15:05, 10 February 2020
no edit summary
(Created page with "At An den Klostergärten/Malteserstraße 170/172 o2 has built its three sectors antennas of the 2G/3G/4G(B20) site on top of this futuristic-looking building. The site was fin...")
 
Line 1: Line 1:
At An den Klostergärten/Malteserstraße 170/172 o2 has built its three sectors antennas of the 2G/3G/4G(B20) site on top of this futuristic-looking building. The site was finished rebuilding with new B3-enabled panels in June 2019.
At An den Klostergärten/Malteserstraße 170/172 o2 has built its three sectors antennas of the 2G/3G/4G site on top of this futuristic-looking building. The site was finished rebuilding with new panels in June 2019.


Seen from the south at An den Klostergärten:
Seen from the south at An den Klostergärten:
3,654

edits