Difference between revisions of "262 3 23152"

11 bytes removed ,  15:05, 10 February 2020
no edit summary
Line 1: Line 1:
At An den Klostergärten/Malteserstraße 170/172 o2 has build its three sectors antennas of the 2G/4G(B20) site on top of this futuristic looking building. The site was finished rebuilding with new B3-enabled panels in June 2019.
At An den Klostergärten/Malteserstraße 170/172 o2 has built its three sectors antennas of the site on top of this futuristic-looking building. The site was finished rebuilding with new B3-enabled panels in June 2019.


Seen from the south at An den Klostergärten:
Seen from the south at An den Klostergärten:
3,654

edits