Difference between revisions of "262 3 23700"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
With an LTE-featuring StOB (licence) from early 2017 and already rebuild a while ago with 4G-enabled Huawei antennas, this o2 B3+B20 site at Mudrastr. 12, Berlin-Lankwitz is | With an LTE-featuring StOB (licence) from early 2017 and already rebuild a while ago with 4G-enabled Huawei antennas, this o2 B3+B20 site at Mudrastr. 12, Berlin-Lankwitz is live since late October 2019. 5G Massive-MiMo panels were added in early 2021 and put into service in May. | ||
Seen from the main street (Malteserstr.) west: | Seen from the main street (Malteserstr.) west: | ||