2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used.
2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used.


[[File:262_1_tbd_262_3_42407_A.jpg|400px]]
2022-04-27: new STOB (064636) with TEF n78
 
2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live
 
2022-08-05: TEF Nokia N78 AAUs mounted + swapped to SRAN, NR (N78+N3) and 4x4 MIMO on B1/3 active
 
[[File:262_1_tbd_262_3_42407_A.jpg|400px]]<br>
+N78/N3 DSS // 4x4 MIMO B1/3 // First seen: 2018
 
[[File:262_1_tbd_262_3_42407_G.jpg|400px]]