262 3 42407

Revision as of 16:11, 6 May 2022 by Okaestne (talk | contribs)

2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used. 2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live

262 1 tbd 262 3 42407 A.jpg