Difference between revisions of "311 480 107206"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
UPDATE: Delayed to 2022 per https://www.bizjournals.com/washington/news/2020/08/25/dc-delays-rfk-demolition.html | UPDATE: Delayed to 2022 per https://www.bizjournals.com/washington/news/2020/08/25/dc-delays-rfk-demolition.html | ||
June 2023 UPDATE: RFK still stands, but Verizon has re-located the site to the roof of Eastern Senior High School to the west with a fully modernized site with B2, B5, B13, B48, B66, n77, and n261. |
Latest revision as of 17:42, 5 June 2023
To future mappers:
RFK Stadium will be demolished by 2021, this eNB will then either move to new location or permanently disappear. If it moves to new location, consider deleting all existing cells and remap everything. -- 05/27/2020
UPDATE: Delayed to 2022 per https://www.bizjournals.com/washington/news/2020/08/25/dc-delays-rfk-demolition.html
June 2023 UPDATE: RFK still stands, but Verizon has re-located the site to the roof of Eastern Senior High School to the west with a fully modernized site with B2, B5, B13, B48, B66, n77, and n261.