Difference between revisions of "515 2 330636"

Jump to navigation Jump to search
(added info)
(update)
 
Line 1: Line 1:
Globe LTE and 5G NR installed on a guyed tube tower. (May 9, 2022)
Globe LTE and 5G NR installed on a guyed tube tower. (December 28, 2023)


A cluster of 3 sectors in that area, broadcasting LTE700, LTE900, LTE1800, LTE2100, TDD-LTE2300, TDD-LTE2500, and 5G NR SA/NSA per sector.
A cluster of 3 sectors in that area, broadcasting LTE700, LTE900, LTE1800, LTE2100, TDD-LTE2300, TDD-LTE2500, and 5G NR SA/NSA per sector.
Line 5: Line 5:
Each sector has two separate eNB IDs: [[515 2 130636|eNB ID 130636]] (decommissioned) and [[515 2 630636|eNB ID 630636]]
Each sector has two separate eNB IDs: [[515 2 130636|eNB ID 130636]] (decommissioned) and [[515 2 630636|eNB ID 630636]]


Site before the network capacity upgrade (photographed in June 4, 2018)
Site before the 5G NR mast had been added (photographed in June 4, 2018)


[[file:Globe eNB ID 330636 silhouette.jpg|350px]]
[[file:Globe eNB ID 330636 silhouette.jpg|350px]]


Site after the network capacity upgrade (photographed in May 9, 2022)
Site after the 5G NR mast has been added (photographed in May 9, 2022)


[[file:Globe eNB ID 330636.jpg|350px]]
[[file:Globe eNB ID 330636.jpg|350px]]