Difference between revisions of "515 2 338184"

From CellMapper Wiki
Jump to navigation Jump to search
(fixed year date)
(update)
Line 1: Line 1:
Globe LTE installed on a guyed tube tower (April 3, 2022)
Globe LTE and 5G NR installed on a guyed tube tower (August 11, 2022)


A cluster of 3 sectors in that area, broadcasting LTE700, LTE900, LTE1800, LTE2100, TDD-LTE2300 and TDD-LTE2500 per sector.
A cluster of 3 sectors in that area, broadcasting LTE700, LTE900, LTE1800, LTE2100, TDD-LTE2300, TDD-LTE2500 and 5G NR SA/NSA per sector.


Site photographed in February 16, 2019:
Site before 5G NR mast had been added (photographed in February 16, 2019):


[[File:Globe eNB ID 338184.jpg|350px]]
[[File:Globe eNB ID 338184.jpg|350px]]


Site photographed in April 3, 2022:
Site after 5G NR mast had been added (photographed in August 11, 2023):


[[File:Globe eNB ID 338184 and Dito eNB ID 327944 (1).jpg|350px]]
[[File:Globe eNB ID 338184 and Dito eNB ID 327944 (1).jpg|350px]]


[[File:Globe eNB ID 338184 and Dito eNB ID 327944 (2).jpg|350px]]
Solo pictures:
 
[[file:Globe eNB ID 338184 (5G mast installed).jpg|350px]]

Revision as of 12:30, 11 August 2023

Globe LTE and 5G NR installed on a guyed tube tower (August 11, 2022)

A cluster of 3 sectors in that area, broadcasting LTE700, LTE900, LTE1800, LTE2100, TDD-LTE2300, TDD-LTE2500 and 5G NR SA/NSA per sector.

Site before 5G NR mast had been added (photographed in February 16, 2019):

Globe eNB ID 338184.jpg

Site after 5G NR mast had been added (photographed in August 11, 2023):

Globe eNB ID 338184 and Dito eNB ID 327944 (1).jpg

Solo pictures:

Globe eNB ID 338184 (5G mast installed).jpg