Difference between revisions of "515 2 630636"

From CellMapper Wiki
Jump to navigation Jump to search
(added info)
(update)
 
Line 1: Line 1:
Globe LTE and 5G NR installed on a guyed tube tower. (May 9, 2022)
Globe LTE and 5G NR installed on a guyed tube tower. (December 28, 2023)


A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 per sector.
A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 per sector.
Line 5: Line 5:
Each sector has two separate eNB IDs: [[515 2 130636|eNB ID 130636]] (decommissioned) and [[515 2 330636|eNB ID 330636]]
Each sector has two separate eNB IDs: [[515 2 130636|eNB ID 130636]] (decommissioned) and [[515 2 330636|eNB ID 330636]]


Site before the network capacity upgrade (photographed in June 4, 2018)
Site before the 5G NR mast had been added (photographed in June 4, 2018)


[[file:Globe eNB ID 330636 silhouette.jpg|350px]]
[[file:Globe eNB ID 330636 silhouette.jpg|350px]]


Site after the network capacity upgrade (photographed in May 9, 2022)
Site after the 5G NR mast has been added (photographed in May 9, 2022)


[[file:Globe eNB ID 330636.jpg|350px]]
[[file:Globe eNB ID 330636.jpg|350px]]

Latest revision as of 10:52, 28 December 2023

Globe LTE and 5G NR installed on a guyed tube tower. (December 28, 2023)

A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 per sector.

Each sector has two separate eNB IDs: eNB ID 130636 (decommissioned) and eNB ID 330636

Site before the 5G NR mast had been added (photographed in June 4, 2018)

Globe eNB ID 330636 silhouette.jpg

Site after the 5G NR mast has been added (photographed in May 9, 2022)

Globe eNB ID 330636.jpg