515 3 134344

Smart LTE and 5G NR installed on a lattice tower. (July 27, 2023)

A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 and 5G NR SA/NSA per sector.

Site before 5G NR mast had been added (photographed in July 8, 2018):

Smart eNB ID 130287.jpg

Site after 5G NR mast had been added (photographed in July 23, 2023):

Smart eNB ID 130287 (5G mast installed).jpg