Difference between revisions of "515 3 134363"

From CellMapper Wiki
Jump to navigation Jump to search
(updated info)
(update)
Line 1: Line 1:
Smart LTE and 5G NR installed on a guyed lattice tower (Sept. 23, 2022)
Smart LTE and 5G NR installed on a guyed lattice tower (August 21, 2023)


A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 and 5G NR per sector.
A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 and 5G NR per sector.
Line 7: Line 7:
Each sector has separate eNB IDs: [[515 3 130735|eNB ID 130735]]
Each sector has separate eNB IDs: [[515 3 130735|eNB ID 130735]]


Site before TDD-LTE2500 and 5G mast had been added:
Site before 5G mast had been added (photographed in June 1, 2021):


[[File:Smart eNB ID 130735.jpg|400px]]
[[File:Smart eNB ID 130735.jpg|350px]]


Site after TDD-LTE2500 and 5G mast had been added:
Site after 5G mast had been added (photographed in September 18, 2021):


[[File:Smart eNB ID 130735-1.jpg|400px]]
[[File:Smart eNB ID 130735-1.jpg|350px]]
[[File:Smart eNB ID 130735-2.jpg|400px]]


===Cellsite database details===
[[File:Smart eNB ID 130735-2.jpg|350px]]
{| class="wikitable"
|-
| LAC (hex/dec): || 9879 / 39033
|-
| Cell ID (hex/dec): || 20cdbd4 / 34397140
|-
| eNB / Cell ID: || 134363 / 212
|-
| PCI: || 352
|-
| Band: || B41
|-
| EARFCN (DL/UL): || 39965 / 39965
|-
| Frequency (DL/UL): || 2527.5 / 2527.5 MHz
|-
| Bandwidth (DL/UL): || 15 / 15 MHz
|}

Revision as of 14:25, 21 August 2023

Smart LTE and 5G NR installed on a guyed lattice tower (August 21, 2023)

A cluster of 3 sectors in that area, broadcasting TDD-LTE2500 and 5G NR per sector.

TDD-LTE2500 went live at September 18, 2021. On September 1, 2021 it was definitly not yet on air.

Each sector has separate eNB IDs: eNB ID 130735

Site before 5G mast had been added (photographed in June 1, 2021):

Smart eNB ID 130735.jpg

Site after 5G mast had been added (photographed in September 18, 2021):

Smart eNB ID 130735-1.jpg

Smart eNB ID 130735-2.jpg