Difference between revisions of "Union Town Center, Colorado Springs"

From CellMapper Wiki
Jump to navigation Jump to search
(create)
 
(add speed test)
 
Line 1: Line 1:
These are a set of three small cells by Union and Research where for a long time Verizon had bad coverage.
These are a set of three small cells or oDAS by Union and Research where for a long time Verizon had bad coverage.


FCC registration has [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrApplication.jsp;JSESSIONID_ASRSEARCH=bb0QG7A2yAGXM_mdB631fSmCM89CoTjvF17JWQz8hiz0DkbD9evM!141641836!1637103530?callingSystem=RS&applKey=4709311 dates from 2011]. The cells were installed early May 8, 2023, and they were active two months later.
These cell sites have CBRS but no 5G (e.g., C-Band, mmWave).
 
== Photo ==


[[File:20230508 Verizon eNB 16590.jpg|400px|Research by Union, taken 2023-05-08]]
[[File:20230508 Verizon eNB 16590.jpg|400px|Research by Union, taken 2023-05-08]]
[[File:20230509 Verizon eNB 16590.jpg|400px|Research by Union, taken 2023-05-09]]
[[File:20230509 Verizon eNB 16590.jpg|400px|Research by Union, taken 2023-05-09]]
== Speed test ==
<gallery>
File:20240507 Verizon eNB 16590 CellMapper.png|CellMapper 2024-05-07
File:20240507 Verizon eNB 16590 Service mode RIL.jpg|Service Mode 2024-05-07
File:20240507 Verizon eNB 16590 Speedtest.png|Speed test 2024-05-07
</gallery>
Speed test 2024-05-07 within 5 feet on Samsung Galaxy S22 with Ting SIM: 531.91 Mbps download, 32.08 upload, 30 ms latency ([https://www.speedtest.net/result/a/10094244318 results])
== Permit and history ==


FCC ARS permit [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2723003 2723003]. No permit seen in PPRBD.
FCC ARS permit [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2723003 2723003]. No permit seen in PPRBD.
FCC registration has [https://wireless2.fcc.gov/UlsApp/AsrSearch/asrApplication.jsp;JSESSIONID_ASRSEARCH=bb0QG7A2yAGXM_mdB631fSmCM89CoTjvF17JWQz8hiz0DkbD9evM!141641836!1637103530?callingSystem=RS&applKey=4709311 dates from 2011]. The cells were installed early May 8, 2023, and they were active two months later.


[[Category: Verizon in El Paso County Colorado]]
[[Category: Verizon in El Paso County Colorado]]
[[Category:speed test]]

Latest revision as of 02:53, 8 May 2024

These are a set of three small cells or oDAS by Union and Research where for a long time Verizon had bad coverage.

These cell sites have CBRS but no 5G (e.g., C-Band, mmWave).

Photo

Research by Union, taken 2023-05-08 Research by Union, taken 2023-05-09

Speed test

Speed test 2024-05-07 within 5 feet on Samsung Galaxy S22 with Ting SIM: 531.91 Mbps download, 32.08 upload, 30 ms latency (results)

Permit and history

FCC ARS permit 2723003. No permit seen in PPRBD.

FCC registration has dates from 2011. The cells were installed early May 8, 2023, and they were active two months later.